Interface: South Central RTD Operations Center and South Central RTD Transit Vehicles

South Central RTD Operations Center and South Central RTD Transit Vehicles

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
South Central RTD Operations Center request for vehicle measures (P)

secure area surveillance control (P)

alarm acknowledge (P)

transit vehicle operator information (P)

South Central RTD Transit Vehicles
South Central RTD Transit Vehicles transit vehicle conditions (P)

secure area surveillance data (P)

alarm notification (P)

transit vehicle loading data (P)

fare collection data (P)

demand response passenger and use data (P)

transit vehicle schedule performance (P)

transit vehicle location data (P)

South Central RTD Operations Center

Last updated: 08-08-14