FTE Regional ITS Architecture (Final)

Projects By Stakeholder


(Printable Version)

The following are a list of ITS projects that have been identified for the region. This list was created from an analysis of the existing Transportation Improvement Plan (TIP) for the region and from discussions with the stakeholders. Projects are listed by stakeholder (agency).

Short term projects are scheduled for the next 5 years. Medium term projects are scheduled for between 5 - 10 years. Long term projects are scheduled for more than 10 years.

Select the stakeholder in the box below to jump to that agency's ITS projects.

Projects By Stakeholder
Stakeholder Project Name Project Status Timeframe Project Description
FDOT District 6
SR 821 HEFT Express Lanes Phase 1 Planned Short Widen HEFT SW 288 to SW 216
SR 821 HEFT Express Lanes Phase 2 Planned Short Widen HEFT SW 216th to Eureka Dr
SR 821 HEFT Express Lanes Phase 3 Planned Short Widen HEFT Eureka to Killiam
SR 821 HEFT Express Lanes Phase 4 Planned Short Widen Killian to SW 72nd
SR 821 HEFT Express Lanes Phase 5 Planned Short Widen HEFT SW 72nd to Bird Road
SR 821 HEFT Express Lanes Phase 6 Planned Short Widen HEFT Bird Road to SR 836
FDOT District 7
SR 589 Veterans Expressway Project X Planned Short Veterans Expressway express lanes implementation. Memorial to Gunn (MM 2.911 to 10.398).
Floridas Turnpike Enterprise
SR 589 AET Planned Medium All Electronic Tolling (AET) Phase 6C Suncoast Parkway
SR 91 Phase 4 Planned Medium Widening Osceola Co. Line to Beachline MP 248 to 254
Broward and Palm Beach DMS Planned Short Off system project. Install Arterial DMS signs in Broward and Palm Beach Counties
I-75 / SR 91 Interchange Planned Short I-75 (SR 93) from SR 44 to North of US 27
SR 417 Planned Short Widen Seminole Expwy - Aloma Ave to SR 434
SR 528 Beachline Planned Short Widen Beachline (SR 528) from I-4 to TPK (MP 0.00 to 4.3) (4 to 6 Lanes)
SR 589 Veterans Expressway AET Planned Short All Electronic Tolling (AET) Phase 6B Gunn Hwy to Van Dyke Rd
SR 589 Veterans Expressway Phase 1 Planned Short Widen Veterans from Memorial to Barry Road (MP 2.74 to 5.35)
SR 589 Veterans Expressway Phase 2 Planned Short Widen Veterans from Barry Road to Linebaugh (MP 5.35 to 7.16)
SR 589 Veterans Expressway Phase 3 Planned Short Widen Veterans from Linegbaugh to Gunn (MP 7.16 to 9.00)
SR 589 Veterans Expressway Phase 4 Planned Short Widen Veterans from S. of Gunn to Sugarwood Mainline Plaza (MP 9 to 11)
SR 589 Veterans Expressway Phase 5 Planned Short Widen Veterans Xway - Sugarwood Mainline Plaza to Van Dyke Rd (MP 11 to 14)
SR 589 Veterans Expressway Project X Planned Short Veterans Expressway express lanes implementation. Memorial to Gunn (MM 2.911 to 10.398).
SR 821 HEFT Express Lanes Phase 1 Planned Short Widen HEFT SW 288 to SW 216
SR 821 HEFT Express Lanes Phase 2 Planned Short Widen HEFT SW 216th to Eureka Dr
SR 821 HEFT Express Lanes Phase 3 Planned Short Widen HEFT Eureka to Killiam
SR 821 HEFT Express Lanes Phase 4 Planned Short Widen Killian to SW 72nd
SR 821 HEFT Express Lanes Phase 5 Planned Short Widen HEFT SW 72nd to Bird Road
SR 821 HEFT Express Lanes Phase 6 Planned Short Widen HEFT Bird Road to SR 836
SR 869 Sawgrass Expressway Existing Short Mainline DMS replacement
SR 91 AET Planned Short All Electronic Tolling (AET) Phase 4B, MP 49 to 54
SR 91 and SR 821 Planned Short Additional Mainline CCTV coverage
SR 91 Phase 1 Planned Short Sunrise Blvd. Interchange Modification
SR 91 Phase 2 Planned Short I-75/Tpk Interchange MP-309