Projects
The Regional ITS Architecture provides a starting point for project definition. It provides an overall framework that shows how anticipated projects will integrate with each other and with existing systems. This page lists all the ITS projects that have been mapped to the regional ITS architecture.
Project | Status | Timeframe | Description |
---|---|---|---|
Arterial Route to Bloomfield Phase 1 | Planned | Short | This project will install a traffic signal at the intersection of US550/NM 173. |
Arterial Route to Bloomfield Phase 2 | Planned | Short | This project would install CCTV on the new arterial running from Aztec to Bloomfield. |
City of Aztec Signal Maintenace | Planned | Medium | This project would create an operational agreement to allow the City of Farmington to monitor and maintain traffic signals for the City of Aztec. |
City of Bloomfield and NMRoads Coordination | Planned | Medium | This project will connect the City of Bloomfield with NMRoads. |
City of Bloomfield Fiber Expansion | Planned | Medium | This project would expand the fiber network in the city of Bloomfield. The project does not map to specific services of the architecture, but is included for completeness. |
City of Bloomfield Flasher Signals | Planned | Short | This project will install flasher signals in the City of Bloomfield, which will flash if a vehicle goes too fast. |
City of Bloomfield Riverwalk | Planned | Short | The City of Bloomfield Riverwalk will create a new retail center in Bloomfield. As part of this project, a new traffic signal will be installed, as well as CCTV. |
City of Bloomfield Signal System Upgrade | Planned | Medium | This project would upgrade the signal system in the City of Bloomfield |
City of Farmington CCTV Expansion | Planned | Short | The project will expand CCTV, which are currently deployed only for signals, for monitoring roadways in the City of Farmington. |
City of Farmington Communications System Upgrade | Planned | Medium | This project would upgrade the City of Farmington communications system and add microwave and video sensors to the network. |
City of Farmington Operations Center Upgrade | Planned | Medium | This project would upgrade the City of Farmington Operations Center. |
City of Farmington Roadway Lighting | Planned | Medium | This project would upgrade the roadway lighting system for the City of Farmington. This would include installing LED street lights to provide power savings, and provide remote monitoring of the lighting system from the City of Farmington Traffic Operations Center. |
City of Farmington RWIS | Planned | Medium | This project would deploy a RWIS system and connect it to both the City of Farmington Street and The City of Farmington Traffic Engineering |
City of Farmington Signal Preemption Upgrade | Planned | Medium | This project would upgrade the signal preemption capabilities in the City of Farmington. This would modernize emergency signal preemption in the City of Farmington and allow the operations center to adjust signal timing. |
City of Farmington Signal System Power Upgrade | Planned | Medium | This project would add Uniterruptible Power Supplies (UPS) to City of Farmington traffic signals. |
City of Farmington Signal Timing Upgrades | Planned | Medium | This project would upgrade the traffic signal timing for the City of Farmington. |
City of Farmington Signal Upgrade | Planned | Short | This project would upgrade the City of Farmington signal system to a Centrax system. |
City of Farmington Traffic Counting | Planned | Medium | This project would upgrade traffic controller to monitor detections and give turning movement counts, as well as timing counts to allow capacity analysis. |
Coordination with Ignacio Transit | Planned | Medium | This project would create a link with Igancio Transit to provide coordination between the transit agencies. |
Coordination with Navajo Transit | Planned | Medium | This project would create a link with Navajo Transit to provide coordination between the transit agencies. |
E Pinion Hills Blvd | Planned | Short | Full rebuild ofthe intersection of Pinion Hills and NM 516, including signalization upgrades. |
Farmington Fire Department CCTV | Planned | Short | This project would install CCTV on command and fire vehicles. The live video feed would be viewable at the San Juan County Communications Center. |
Interstate Coordination | Planned | Medium | This project would tie in NMDOT District 5 TOC to Colorado and Arizona regional or statewide systems. The aim would be to coordinate center to center information concerning highways near state borders, including 550, 170 and 491. This project would also involve deploying additional DMS and coordinating DMS with other states to redirect traffic when passes or roads leading to other states are closed. |
Navajo Nation Tribal Traffic Signal Maintenace | Planned | Medium | This project would create an operational agreement to allow the City of Farmington to monitor and maintain traffic signals for the Navajo Nation. |
NMDOT CCTV | Planned | Short | This project would deploy CCTV on 550 north of Aztec, as well as on 516. |
NMDOT DMS Expansion | Planned | Short | This project would install additional DMS at US 550, US 64 and NM 170 |
NMDOT RWIS | Planned | Short | This project would install RWIS to measure roadway surface conditions, including on bridges. The RWIS would be connected to a DMS to advise motorists about unsafe pavement conditions. |
Regional Signal Control System | Planned | Short | This project would allow the City of Farmington to remotely connect with City of Bloomfield and San Juan County signal systems. |
Regional Transit Information | Planned | Short | This project would provide regional transit information onto Google Transit. |
San Juan County Communications Authority Communications Upgrade | Planned | Short | This project will upgrade the computer-aided dispatch (CAD) system for San Juan County, allowing the Communications Authority to automatically dispatch police and fire vehicles in the region. |
San Juan Regional EMS AVL and GIS Upgrade | Planned | Short | This project would upgrade the AVL and GIS system for San Juan Regional EMS. In addition, it will allows San Juan EMS vehicles to send information to hospitals while en route. |
Tablets on Buses | Planned | Short | This project will install tablets on fixed-route buses to provide communications from dispatch to drivers. |