Interface: Vehicles and NMROADS Admin
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
Vehicles | trip request (P) trip confirmation (P) traveler profile (P) | NMROADS Admin |
NMROADS Admin | trip plan (P) | Vehicles |