Farmington ITS Architecture Update
Interface: NMDOT Field Devices and NMDOT District 5 TOC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
NMDOT Field Devices
short range communications status (P)
field device status_ud (P)
roadway warning system status (P)
variable speed limit status (P)
barrier system status (P)
roadway information system status (P)
traffic images (P)
traffic flow (P)
NMDOT District 5 TOC
NMDOT District 5 TOC
vehicle signage data (P)
roadway warning system control (P)
variable speed limit control (P)
barrier system control (P)
roadway information system data (P)
video surveillance control (P)
traffic sensor control (P)
NMDOT Field Devices
Last updated: 06-30-15