Farmington ITS Architecture Update
Interface: Aztec Field Devices and Aztec Traffic Management
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Aztec Field Devices
roadway information system status (P)
field device status (P)
signal fault data (P)
signal control status (P)
right-of-way request notification (P)
traffic images (P)
traffic flow (E/P)
Aztec Traffic Management
Aztec Traffic Management
roadway information system data (P)
signal system configuration (P)
signal control plans (P)
signal control device configuration (P)
signal control commands (P)
video surveillance control (P)
traffic sensor control (E/P)
Aztec Field Devices
Last updated: 06-30-15