Farmington ITS Architecture Update
Interface: Aztec Field Devices and NMDOT Signal Lab
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Aztec Field Devices
traffic images (E)
traffic flow (E)
signal fault data (E)
signal control status (E)
right-of-way request notification (E)
NMDOT Signal Lab
NMDOT Signal Lab
video surveillance control (E)
traffic sensor control (E)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
Aztec Field Devices
Last updated: 06-30-15