Interface: Aztec Field Devices and Farmington Traffic Operations Center

Aztec Field Devices and Farmington Traffic Operations Center

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
Aztec Field Devices traffic images (P)

traffic flow (P)

signal fault data (P)

signal control status (P)

right-of-way request notification (P)

Farmington Traffic Operations Center
Farmington Traffic Operations Center video surveillance control (P)

traffic sensor control (P)

signal system configuration (P)

signal control plans (P)

signal control device configuration (P)

signal control commands (P)

Aztec Field Devices

Last updated: 06-30-15