Interface: Farmington Traffic Operations Center and San Juan County Field Devices

Farmington Traffic Operations Center and San Juan County Field Devices

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
Farmington Traffic Operations Center video surveillance control (P)

traffic sensor control (P)

signal system configuration (P)

signal control plans (P)

signal control device configuration (P)

signal control commands (P)

San Juan County Field Devices
San Juan County Field Devices traffic images (P)

traffic flow (P)

signal fault data (P)

signal control status (P)

right-of-way request notification (P)

Farmington Traffic Operations Center

Last updated: 06-30-15