Interface: DDOT TMC - I-95 CC Information Exchange Network

DDOT TMC to I-95 CC Information Exchange Network Interface Diagram

Architecture Flow Definitions

current asset restrictions  (Planned)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

maint and constr work plans  (Planned)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

traffic information coordination  (Planned)  Applicable ITS Standards

Traffic information exchanged between TMC’s. Normally would include incidents, congestion data, traffic data, signal timing plans, and real-time signal control information.