Interface: MATOC - WMATA Rail Operations Control Center

MATOC to WMATA Rail Operations Control Center Interface Diagram

Architecture Flow Definitions

incident information  (Planned)  Applicable ITS Standards

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large-scale natural or human-caused disasters that involve loss of life, injuries, extensive property damage, and multi-jurisdictional response. This also includes special events, closures, and other planned events that may impact the transportation system.

request transit information  (Planned)  Applicable ITS Standards

Request for transit service information and current transit status.

road network conditions  (Planned)  Applicable ITS Standards

Current and forecasted traffic information, road and weather conditions, and other road network status. Either raw data, processed data, or some combination of both may be provided by this architecture flow. Information on diversions and alternate routes, closures, and special traffic restrictions (lane/shoulder use, weight restrictions, width restrictions, HOV requirements) in effect is included along with a definition of the links, nodes, and routes that make up the road network.

threat information  (Planned)  Applicable ITS Standards

Threats regarding transportation infrastructure, facilities, or systems detected by a variety of methods (sensors, surveillance, threat analysis of advisories from outside agencies, etc.

traffic images_ud  (Planned)  

High fidelity, real-time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and the operational status of the surveillance system.

transit demand management request  (Planned)  Applicable ITS Standards

Request to change the demand for transit facility use through pricing or other mechanisms.

transit demand management response  (Planned)  Applicable ITS Standards

Response to transit demand management change requests indicating level of compliance with request.

transit emergency data  (Planned)  Applicable ITS Standards

Initial notification of transit emergency at a transit stop or on transit vehicles and further coordination as additional details become available and the response is coordinated.

transit system data  (Planned)  Applicable ITS Standards

Current transit system operations information indicating current transit routes, the level of service on each route, and the progress of individual vehicles along their routes for use in forecasting demand and estimating current transportation network performance.