Interface: DDOT TMC and DDOT HAR

DDOT TMC and DDOT HAR

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
DDOT TMC reversible lane control (P)

signal control data (P)

roadway information system data (P)

DDOT HAR
DDOT HAR field device status (P)

reversible lane status (P)

roadway information system status (P)

DDOT TMC

Last updated: 06-10-11