Interface: DDOT TMC and DDOT Street Car Field Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT TMC | hri request (P) hri control data (P) | DDOT Street Car Field Equipment |
DDOT Street Car Field Equipment | hri status (P) | DDOT TMC |