AMPA Regional ITS Architecture Update

Interconnect: Rio Metro Operations Center - Rio Metro Transit Vehicles


(Click on image to view full-size)
Rio Metro Operations Center - Rio Metro Transit Vehicles

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Rio Metro Operations Center transit traveler information (E)
request for vehicle measures (P)
secure area surveillance control (E)
alarm acknowledge (P)
transit vehicle operator information (E)
Rio Metro Transit Vehicles
Rio Metro Transit Vehicles transit vehicle loading data (P)
transit vehicle conditions (P)
secure area surveillance data (E)
alarm notification (P)
request for bad tag list (P)
fare collection data (P)
transit vehicle schedule performance (E/P)
transit vehicle location data (E)
Rio Metro Operations Center