AMPA Regional ITS Architecture Update

Interconnect: Rio Metro Operations Center - Rail Runner Wayside Equipment


(Click on image to view full-size)
Rio Metro Operations Center - Rail Runner Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Rio Metro Operations Center   Rail Runner Wayside Equipment
Rail Runner Wayside Equipment rail location data_ud (P)
trigger control (P)
Rio Metro Operations Center