AMPA Regional ITS Architecture Update

Interconnect: Rail Runner Operations/Dispatch - Rail Runner Transit Rail Vehicles


(Click on image to view full-size)
Rail Runner Operations/Dispatch - Rail Runner Transit Rail Vehicles

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Rail Runner Operations/Dispatch transit traveler information (E)
request for vehicle measures (P)
secure area surveillance control (E)
alarm acknowledge (P)
transit vehicle operator information (E)
transit schedule information (E)
Rail Runner Transit Rail Vehicles
Rail Runner Transit Rail Vehicles transit vehicle loading data (P)
transit vehicle conditions (P)
secure area surveillance data (E)
alarm notification (P)
request for bad tag list (P)
fare collection data (P)
transit vehicle schedule performance (E/P)
transit vehicle location data (E)
Rail Runner Operations/Dispatch