AMPA Regional ITS Architecture Update

Interconnect: NMDOT Traffic Signals - Rail Operators Wayside Equipment


(Click on image to view full-size)
NMDOT Traffic Signals - Rail Operators Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
NMDOT Traffic Signals intersection blockage notification (P)
hri operational status (P)
Rail Operators Wayside Equipment
Rail Operators Wayside Equipment arriving train information (P)
track status (P)
NMDOT Traffic Signals