AMPA Regional ITS Architecture Update

Interconnect: NMDOT Ramp Metering Devices - NMDOT Statewide TMC


(Click on image to view full-size)
NMDOT Ramp Metering Devices - NMDOT Statewide TMC

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
NMDOT Ramp Metering Devices field device status_ud (P)
traffic metering status (P)
roadway information system status (P)
NMDOT Statewide TMC
NMDOT Statewide TMC traffic metering control (P)
roadway information system data (P)
NMDOT Ramp Metering Devices